Construction and Building in London  
A-Z Construction and Building Services throughout West London

Building Services :: NATIONAL HEALTH SERVICE

"A-Z Construction have undertaken a wide range of building projects for the National Health Service including building work at Hammersmith Hospital, Charing Cross Hospital, Mount Vernon Hospital, Hillingdon Hospital and St Thomas’ Hospital"




NHS :: CASE STUDY 1 - Charing Cross Hospital


Various building projects undertaken:

1.
Front Entrance

An extremely busy hospital at all times, A-Z were responsible for the installation of the new road layout to the front entrance of Charing Cross Hospital. With extremely careful traffic management, a new road layout was installed, comprising of a new zebra crossing, new additional speed ramps for traffic control, new road markings and road signs.


2. Human Anatomy Department

An unusual job for A-Z, the hospital's anatomy dept required the removal of it's refrigeration unit, replacing it with an open shelving storage system for the human anatomy's. This was a large project requiring the removal of the old refrigeration unit along with the careful removal of the Dorin 22 gas, used in these units. In order to create the new Clean Room Department, a raised concrete plynth had to be created, with a channel and drainage system. Also installed was a new air conditioning system behind the newly installed white rock altro walls. Various 3 phase electrical work and lighting system. (Click images to enlarge)


3. Histopathology Department:

Required the existing rooms to be stripped of their internal heating and ducting systems. A new ceiling system was installed incorporating radiant heating panels with barrel pipework, commisioning sets and strainers. Trespa laboratory grade work surfaces were fitted throughout onto speedframe benching. Specialist flooring was fitted throughout the department with welded joints.

Electrics were required throughout, using MK trunking. Also installed were a fire alarm system and voice and data system. The department also required the installation of a ventilation system installing flow and return ducting with damper control. Full working kitchen was also supplied and fitted. The glass waste system was removed, capped off and reinstalled using vulcathen.

A-Z Construction :: Histopathology Department, Electrical Work (click pictures to enlarge)
       


NHS :: CASE STUDY 2 - Breast cancer screening unit


With minimum disruption to the traffic flow within the front grounds of Charing Cross Hopsital, A-Z were required to create a concrete base, complete with services, ready for the delivery of their new Breast Cancer screening mobile unit. From the pictures below you will see an almost step by step view of how this was created.

Before      
       
       
 
       
After      
       
       
     


Contact A-Z Construction



National Health Service (NHS) - key tags

"A-Z Construction have undertaken a wide range of building projects for the national Health Service ..."

  1. Public sector contract specialist
  2. Plant room floor specialist
  3. Registered NHS preferred contractor